The Future of Prefabricated Housing
Installing a prefab home follows a clear, efficient timeline:


  1. Site Preparation: The lot is cleared, graded, and a foundation (e.g., concrete slab, crawl space) is poured.

  2. Component Delivery: Factory-built sections (modules or panels) are transported to the site via trucks.

  3. Assembly: A crane or team assembles the components—modular sections are stacked and connected, while panels are fitted together.

  4. Finishing Touches: On-site work includes connecting utilities (water, electricity, sewage), adding siding, and finishing interiors (paint, flooring).
    Most installations take 1–4 weeks, depending on the home’s size.